 |
| Main control panel (32 MW) |
|
|
Power and control cabling according to European standards (cable tray-cabling). Power and control cabling according American standards (closed conduit systems). Power distribution panels. Control panels. PLC configuration. Engineering and drafting. Explosion proof installations.
Some of our projects:
Antillean Soap Company Curaçao 2000 Amps main distribution panel. Power and control installation of an ultra soap powder plant.
Curoil Curaçao Power and control for a fuel bunkering station, 4 pumps 150 kW each, with generator back-up.
Isla refinery Curaçao Various power and control installations.
Bopec Bonaire Various power and control installations for the crude oil transshipment terminal.
Pan Americana Curaçao office Electrical and security systems.
WEB Bonaire Power and controls for a 1.000 m3/day reverse osmose waterplant.
Aqualectra Curaçao Power and controls on a 37 MW dieselpowerplant.
Shell/Heerema On shore installations for the assembling of the URSA platform.
|
 |
| Power and control cabling |
|
|
 |
| Cables |
|
|
 |
| Ursa TLP 1999 |
|
|
Main power distribution panel Bonaire. 480 volts/3200 Amps.
|
|
Surinaamse Waterleiding Maatschappij.
Revamp/extention of drinkwaterpumpingstations at Blauwgrond, WK-Plein and Van Hattumweg.
|
|